Paver Setup

Paving Checklist

  • Verify paver tractor and screed are properly maintained, greased, fueled, and fully operational.
  • Verify all equipment is ready including electronics, skis, and cables.
  • Perform safety walk around check, check fluids, and condition of screed plate, augers, chains, extensions, attachments.
  • Use stringline, paint, or fixed structure to establish steering guide.
  • When using joint matcher, position sensor at leading edge of screed.
  • Verify mat width to avoid longitudinal joint in wheel paths.
  • Block screed up and use stringline to check for crown or verify flatness of screed and extensions.
  • Use starting blocks or asphalt pad under screed to establish thickness of roll-down. (~1/4 inch per inch of compacted thickness)
  • Use CAT Paving-By-The-Numbers as generic guideline for paver setup. See your specific manufacturer’s manual for specifics.

YouTube: Cat® At Home Series – Paving by the Numbers with Ron Wilson

YouTube: Paving by the Numbers for Cat® F-Series Pavers with Vibratory Screeds

Paver/Screed Startup Checklist – recheck each start.

  • Heat the screed.
  • Set the tow points.
  • Set paving width.
  • Set crown height.
  • Set extender height.
  • Set extension slope
  • Set screed and pull forward to remove slack
  • Null the screed.
  • Position end gates – add slack (loose washer).
  • Set auger height.
  • Position feeder sensors.
  • In low idle, fill auger chamber & shovel to end gates. Do not overfill the head of material in auger area.
  • Adjust feeder controls.
  • Set accessory functions. (ski’s, joint matcher, and or slope sensors)
  • Pull off starting blocks/pad.

Segregation potential increases with aggregate size.  B versus D