Tack/Bond/Seal

Paving Checklist

  • Ensure existing pavement is clean and dry prior to tacking.
  • Do not overlay recently placed crack seal materials.
  • Verify proper tack is used for project – verify bill of lading.
  • Verify handling/storage/cleanout procedures with tack supplier.
  • Do not dilute emulsions in the field.
  • Determine appropriate rate for surface to be paved.
  • Verify correct nozzles are used for product and application rate.
  • Verify tack bar height (~12 in) and nozzle angle (~30 degrees).
  • Tack all surfaces – even same day lift interfaces.
  • Tack all vertical edges (curbs, structures, joints).
  • Tack vertical face on internal longitudinal joints (except for PFC)
  • Verify tack rate and uniformity at beginning of shift.
  • Apply tack a minimum of 3 inches wider than mat width to provide for overlap on adjourning mat.
  • Verify uniformity of application routinely (distributor and spray paver). No streaks or corn rows.
  • Ensure emulsified tack is broke and set before paving.
  • Record total gallons used at end of shift.

Sign up for checklist updates and new resources from Texas Asphalt Pavement Association.