Paving Checklist

  • Verify spread rate, slope, and width to required cross sections.
  • Warm Mix Asphalt (WMA) – Run first 3-4 loads hotter to heat up equipment.
  • Maintain proper height of material in hopper or hopper insert – do not empty hopper between loads.
  • Keep the Head of Material in the auger chamber constant. Strive for plus or minus 1 inch from center of auger shaft.
  • Adjust feeder controls to keep augers turning 80-100% and 20-40 rpm. 
  • Adjust or match height/slope of extensions to screed to eliminate screed extension lines/marks in mat.
  • When using grade and or slope control, adjust screed controller, not manual thickness screw.
  • Routinely:
    • Observe HMA being discharged into hopper or insert for changes in characteristics of the mix.
    • Check temperature of mix.
    • Check texture of finished mat edge-to-edge and station-to-station.
    • Strive for uniformity.
    • Verify width, thickness, cross slope to match target.
    • Verify spread rate or yield to match target.
  • Pave at a constant speed (See Balancing Production Rates) and use rapid stop/start if trucks run out.   
  • Engage hydraulic assist to lock screed lift cylinders when speed slows/stops to keep screed from settling in mat.
  • Switch screed to float when paving.
  • Adjust the screed width during paving to minimize joint overlap and eliminate raking/luting of joint.
  • Fix mat defects from pavement edge with lute and enough mix to fill – do not broadcast or backscatter mix on pavement surface.
  • Use Lute/Rack to remove oversize materials and discard for repairs or patches.
  • Do not walk on uncompacted asphalt mat.
  • Keep screed walkway clear.
  • At end of shift, remove buildup of cold asphalt from hopper, conveyors, augers, screed, and pivot areas.
  • Park equipment in safe zone.
  • Collect all delivery tickets, verify loads, quantities, and paved areas at end of each shift.